Metrics | FY, 2017 | FY, 2018 | FY, 2019 | FY, 2020 |
---|---|---|---|---|
Suppliers | 9.4K | 9K | 9.8K | |
Revenue Ton Miles | 142.5B | 154.2B | 154.4B | 151.9B |
Rail Ties Installed | 1.1M | 1M | 1.1M | |
Average Train Length, feet | 7.2K | 7.3K | 7.4K | 7.9K |
Average Train Speed, mph | 22.6 | 21.5 | 22.2 | 22 |
Average Train Weight, tons | 8.8K | 9.1K | 9.1K | 9.7K |
Fuel Efficiency, gallons/1000 GTMs | 1 | 1 | 1 | 0.9 |
Locomotive Productivity, GTMs/operating horsepower | 201 | 198 | 202 | 207 |
Gross Ton-Miles | 252.2M | 275.4B | 280.7B | 272.4B |
Average Terminal Dwell, hours | 6.6 | 6.8 | 6.4 | 6.5 |
Main Track Miles Inspected | 1.7M | 1.8M | 1.9M | |
Main Track Inspections | 81.4K | 83.4K | 86.7K | |
Carloads Shipped | 2.6M | 2.7M | 2.8M | 2.7M |