Craft
Header placeholder lorem ipsum dolor sit amet, consectetur adipiscing elit.
banner
APMTerminals Valencia key operating metrics including Annual Terminal Capacity, TEU.

Annual Terminal Capacity, TEU

1.6M

Sep, 2021

Terminal Area, hectares

45

Sep, 2021

Water Depth, meters

17

Sep, 2021

Operating Metrics

MetricsFeb, 2021Sep, 2021
Annual Terminal Capacity, TEU1.6M1.6M
Terminal Area, hectares4545
Water Depth, meters1717
Reefer Plugs750750
Rail Track Length, meters685685
Rail Tracks22
Cranes1212

Footer menu